PROJECTS
Abu Dhabi Media
Circuit tracing of all the primary electrical circuits from the incoming mains, through to the Final DB panels within the TV building (D&C), Radio building (G), of the individual breakers within those Final DB Panels and to use this information to produce new DB Legends.
GEMS School
A thorough building condition audit was performed before recommencing the fitout works, offering a comprehensive understanding of the building. The inspection and subsequent report enabled the client to make well-informed decisions about the project’s next steps, all the while ensuring adherence to statutory regulations.
Aldar Properties
An in-depth, visual building condition audit focusing on construction quality, construction code compliance, mechanical installations, electrical installations, fire and life safety installation, and accessibility for people of determination. The condition audit was carried out on both Etihad Plaza and Etihad Airways Centre.
Nakheel Properties
Full Building Handover Inspection with Re-Inspections were performed for multiple buildings of Nakheel in District One Meydan. Apartments and common areas were inspected to ensure contractor compliance prior to handover and occupancy.
Al Ghurair Real Estate LLC
A full building inspection, common areas and all apartments, was carried out for one of the properties of Al Ghurair Real Estate LLC to ensure that the property will be ready for handover and occupancy.
NSHAMA
Building Condition Audit with Reserve Fund Study and Recourse Allocation Study for various mixed-use buildings and townhouses in Townsquare.
Deyaar
Building Condition Audit and special inspections were conducted on several residential buildings of Deyaar to ensure that all installations were done properly, and all equipment are working as per specification.
Dubai Hills Master Community
Based on the assessment of the current condition of the assets in the Master Community, Snag Property Inspection created a Reserve Fund Study and Reinstatement Cost Assessment to ascertain the availability of funds for periodic maintenance as well as rebuild costs.
Dubai World Central Corporation
Established and assessed the property in terms of the accuracy and quality of the base build information provided, quality and condition of the base build and fit out MEP works done, and reviewed the design and / or recorded information available, such as specifications, equipment schedules, O&M manuals, as-built drawings. The MEP and building approvals obtained from the authorities were carefully evaluated as well.